







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across West Miami
If you’re researching bathroom remodeling in West Miami, FL, you’re probably wondering what the job actually costs and how long it takes. The answer, for most homes in this city, lands between $10,620 and $33,040 for a full bathroom remodel, with Tub-to-Shower Conversions running $4,130 to $11,800. At Sawyer Remodeling, we put that number in writing before any tools come out.
We know West Miami’s housing stock because we’ve worked in it. Your home was likely built in the 1950s or 1960s, which means original plumbing that’s now 60 to 70 years old. That’s not a problem if you plan for it. It only becomes one when a contractor pretends it doesn’t exist until the tile is already up. Call us at (254) 272-5876 and we’ll walk you through what your specific bathroom likely needs before you commit to anything.
Why Sawyer Remodeling Is West Miami’s Preferred Bathroom Remodeling Company

West Miami homeowners call us because we run jobs under The Relay Visibility Guarantee: a live arrival time, before-and-after photo updates, and a written price confirmed before work starts. You know who’s coming, when they’re pulling up, and what you approved. No ghosts, no surprises at the invoice.
Luca Romano, our lead in the South Florida market, has built a reputation in West Miami by treating the estimate process as a diagnostic, not a sales pitch. When we scope a bathroom on a 1960s slab foundation off Southwest 8th Street, we check the drain line, the shutoff valves, and the subfloor before we quote. That’s why our numbers hold.
Every technician who enters a West Miami home is background-checked and uniformed. You see the name and photo of who’s coming before they arrive, tracked live. And if you call at any hour, a live person answers. Not a voicemail.
Styles & brands we work with







Tub to Shower Conversion in West Miami
A Tub to Shower Conversion in West Miami replaces an existing bathtub with a walk-in shower, and for most 1950s and 1960s ranches this is the single highest-value bathroom upgrade you can make. The work involves demoing the tub, inspecting the drain and supply lines, addressing any rot or corrosion found, setting the shower pan, waterproofing, tiling, and installing the new valve and fixtures. Depending on condition, the job runs $4,130 – $11,800.
Why West Miami homeowners choose it
Most original West Miami bathrooms were built with a 5-foot tub that nobody under 60 actually uses. Converting it frees floor space and eliminates the step-over lip, which matters more than people admit as parents age or mobility changes. The result is a shower you can just walk into.
The drain is usually the surprise
In West Miami homes with original cast-iron drain lines, the P-trap under the tub is often the first thing to fail. We camera the line before we quote. If it’s corroded, we budget the replacement from day one. That beats cutting it open mid-job and adding a change order you didn’t see coming.
One Day Bath Remodel in West Miami

A One Day Bath Remodel in West Miami is designed for homeowners who don’t want their only bathroom torn apart for weeks. The process uses pre-measured wall systems and a fitted pan that installs over the existing footprint in a single day once all materials are on site. In West Miami, the price usually runs $5,900 – $14,160 depending on the size of the opening and whether the rough-in passes inspection.
When it’s the right fit
This option works well in smaller West Miami homes, like the two-bedroom block houses near Flagami, where a second bathroom isn’t an option and the family can’t shower at the neighbor’s for a month. The work moves fast because the system is pre-cut and pre-fit to standard tub openings.
Inspection is still required
West Miami inspectors won’t sign off on new wall panels if the supply lines behind them are original, ungrounded, or not code-compliant. One of our field crews learned this on a 1958 ranch off Southwest 62nd Avenue near Coral Way: the tub drain was a corroded cast-iron P-trap that had to be cut out and replaced with PVC before the conversion could be rough-in inspected, and the subfloor under the old tub showed water damage that required partial plywood replacement. We changed the order with the homeowner in writing before proceeding, added $1,850 to the original Tub-to-Shower Conversion allowance, and passed inspection sign-off on the first visit after the plumbing rough-in was exposed for the inspector. That’s how a one-day remodel stays honest.
Trusted Brands We Service in West Miami
We stock fixtures and materials from brands West Miami homeowners recognize, including Kohler faucets and showerheads, KraftMaid vanities, and Cambria quartz tops. We maintain local parts access through our South Florida supply partners, which means we’re not waiting on a truck from another state when a valve cartridge fails or a trim piece arrives scratched. You pick from real, manufacturer-backed products. Not whatever was cheapest at the distributor that week.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in West Miami Homes
- Failed cast-iron drains: Homes built before 1970 in West Miami typically used cast iron for waste lines. After six decades, the interior is often scaled or cracked. If you don’t camera the line before you set the shower pan, you can turn a $6,000 conversion into a $10,000 emergency.
- Undersized 1.5-inch copper supply lines: Original plumbing in many West Miami homes wasn’t sized for modern shower valves and thermostatic mixers. If the rough-in doesn’t meet current code, the inspector will fail it, and the fix means opening walls you just closed.
- Subfloor rot under old tubs: Decades of slow leaks from aging tub flanges and tile grout in West Miami’s humid climate rot out plywood subfloors. You won’t see it until the tub comes out. We price a contingency for this in writing so you’re not surprised.
- Outdated permit records: Many West Miami homes have decades of unpermitted work. The city’s older records often don’t match what’s actually inside the walls. We pull records before we quote so the inspection schedule is realistic from day one.
Pricing for Bathroom Remodeling in West Miami, FL
Here are the real numbers for West Miami, based on what we’ve actually scoped and built in this city’s housing stock.
| Project Type | Typical Range in West Miami |
|---|---|
| Full Bathroom Remodel | $10,620 – $33,040 |
| Small Bathroom Remodel | $5,900 – $14,160 |
| Tub-to-Shower Conversion | $4,130 – $11,800 |
| Walk-In Shower Installation | $5,310 – $14,160 |
| Shower Replacement | $3,540 – $10,030 |
| Bathroom Vanity Installation | $945 – $3,540 |
What moves the number: the condition of your cast-iron drain line, whether your supply lines need upgrading to pass code, the type of waterproofing system (Schluter edge trim and membrane materials cost more than basic cement board, and for good reason), and your fixture selections. We write allowances into the scope so if you pick a KraftMaid vanity and a Cambria top, we’re not re-pricing the job at the end. Call (254) 272-5876 and we’ll give you a written line-item estimate. Free, no obligation.
We Also Serve Cities Near West Miami
If you’re in Miami, Hialeah, Miami Gardens, or Homestead, our crews run the same process and the same written pricing. Our West Miami page covers the local specifics of this city; for more on our approach to the work itself, see our Bathroom Remodeling hub page. Same team, same guarantee, same phone number.
Serving West Miami, FL - Our Local Coverage Area
We’re based in the West Miami area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in West Miami
Yes, most bathroom remodels in West Miami that involve moving plumbing, replacing a drain line, or opening walls require a permit. The inspection covers the rough-in stage (the plumbing and waterproofing before walls close) and the final sign-off for fixtures and drainage. We pull the permit, schedule the inspection, and stand there while it happens. Homeowners whose previous contractor skipped a permit get to discover that when they try to sell.
The honest answer: because 1950s and 1960s West Miami homes hide cast-iron failures, undersized supply lines, and rot that no bid can see until the walls or tub come out. On our jobs, these aren’t “surprises that cost more” – they’re line items we flagged during the walkthrough and planned for. When new facts do surface mid-demolition (and sometimes they do), we put the change in writing and get your approval before touching it. You’ll know the number before the work happens. Call (254) 272-5876 for an estimate that accounts for what your home is actually built from.
Two to four weeks for most full bathroom remodels in West Miami. One Day Bath Remodels run one day of installation, but plan for the inspection to happen on a separate day. The float between two and four weeks hinges on whether we’re moving plumbing, how quickly the inspector can get to your street, and whether the tile you chose is in stock. We give you a calendar at contract signing, not a vague estimate.
Yes, and in most cases the drain location stays exactly where it is. The conversion uses a shower pan designed to match the existing tub drain position. However, “not moving” the drain doesn’t mean ignoring it. We camera the line first; if it’s a corroded cast-iron trap from the original build, it gets replaced before the pan goes in. The cost for that replacement is written into your quote, not dropped on you after the demo.
We install Kohler, Moen, and Grohe fixtures, KraftMaid and Wellborn vanities, and Cambria and Caesarstone tops, among others. An allowance is a dollar amount written into your contract for each material category. You pick whatever you want within that number. If you choose something above it, you know the exact difference before we order. No one eats a cost, no one gets a surprise. If you want help narrowing down, we’ll point you to what has held up well in other West Miami homes. Call (254) 272-5876 and we’ll walk you through a scope with allowances for your specific bathroom.
Written by Luca Romano, Owner at Sawyer Remodeling, serving West Miami since 2005.










