A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Wellborn Home Additions & ADU Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansProudly serving local communities 21+ years
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A small remodeled galley kitchen with cabinets to the ceiling
A freestanding soaking tub in a remodeled primary bathroom
A whole-home remodel with the living, dining and kitchen areas opened up
A second-story addition that matches the existing roofline
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Wellborn Home Additions & ADU: The Los Angeles Owner’s Guide

A Wellborn home addition or ADU in Los Angeles typically runs $106,200 – $259,600 for a complete permitted build, and most projects take 4 – 7 months from plans to final inspection. We install and service these every month across LA, and we stock the most common replacement parts for Wellborn cabinet lines used in additions and ADUs, including hinges, drawer slides, and matching door fronts. Here’s the reality: when a Wellborn component fails mid-project or after completion, it’s rarely the cabinet box. It’s the hardware that took daily wear, the soft-close mechanism that gave out, or a door front that warped because the ADU wasn’t climate-controlled during framing.

Call (254) 272-5876

The good news is that most Wellborn failures are repairable without tearing out cabinetry. The better news is that we carry the hardware on our trucks, and Luca Romano has been building and finishing these spaces in Los Angeles since long before ADUs became the city’s favorite square footage play.

Which Wellborn Models This Applies To

A walk-in pantry with wood shelving

Wellborn has made cabinets under several distinct construction lines, and the parts are not interchangeable across all of them. If your addition or ADU has Wellborn Premier, Wellborn Estate, or Wellborn Select cabinetry, you’re working with full-extension drawer guides and a specific hinge cup size. The Wellborn Cabinet Essentials line (often spec’d in ADUs to keep the build under budget) uses a lighter hinge and a thinner drawer box side. The hardware between these lines does not swap cleanly without modifying the bore depth.

Here’s the compatibility gotcha we run into constantly in Los Angeles: standard Blum 110-degree hinges work on most Wellborn door profiles, but the Wellborn full-overlay pattern requires a 0mm crank on the hinge arm. A generic 9mm crank from the big box store will leave a visible gap at the reveal. It’s the single most common reason a well-meaning weekend fix looks off by an eighth of an inch. And in a new ADU where every inspector’s eye is on the finish line, that gap is the first thing the appraiser’s photographer catches.

OEM Wellborn hardware is solid, but we’ve also installed thousands of Blum and Salice aftermarket equivalents with identical fitment and a better lifespan in dry Southern California air. The decision comes down to whether you want a Wellborn-stamped label inside the door or a part that performs the same for less. We’ll show you both and let you decide.

Also worth knowing: wellborn cabinet drawer boxes in ADUs built since 2018 are predominantly dovetail maple with a 5/8-inch bottom. Older boxes before that used a 1/2-inch bottom. That difference matters when you’re replacing a drawer entirely. A generic side-mount slide will not ride smoothly on the newer 5/8-inch spec without shimming.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your Wellborn Home Additions & ADU Is Failing

  • Soft-close drawer slams shut or drifts open. The damper inside the slide has blown its seal. Wellborn’s soft-close slides in Los Angeles see more failures in inland neighborhoods like Reseda and Sherman Oaks, where summer heat accelerates the internal grease breakdown. The slide still moves, but the catch is gone.
  • Cabinet door hangs crooked or rubs the frame. One hinge has worn at the pivot, or the mounting plate screws have pulled loose from the face frame. In Wellborn boxes, the face frame is solid hardwood, so stripping is usually a sign the original installer ran screws too fast with an impact driver instead of a clutch driver.
  • Drawer front separates from the drawer box. This is a mechanical fastening failure. Wellborn uses a combination of screws and adhesive. In uninsulated ADUs that sat through a full Los Angeles summer before climate control was installed, that adhesive can cure brittle and crack. The drawer still works, but the front eventually lets go under load.
  • Pulls or knobs feel loose repeatedly after tightening. The threaded insert in the backside of the Wellborn door front has started spinning. It’s a hardware insert issue, not user error. Over-tightening makes it worse, and the permanent fix is a threaded insert replacement, not a longer screw.
  • Cabinet boxes pull away from the wall in the ADU. If the addition settled or the framing dried out, the original install screws lose bite. This one we treat as a structural correction, not a hardware swap. Los Angeles soil movement from the rainy season to the dry months is a real factor, especially in hillside ADUs in Mount Washington or Echo Park.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A remodeled kitchen with a waterfall island and wood cabinets

For parts alone, most Wellborn hardware replacements in Los Angeles run $25 – $90 per hinge or slide, depending on whether you go OEM or aftermarket. A full cabinet door front, factory-matched and finished, runs $140 – $320. A complete drawer box runs $180 – $410. Those are the numbers you’ll see on a written quote before any work begins.

Installed pricing for hardware-level repairs, including the service call and labor, lands at $185 – $450 for a typical single-cabinet fix in Los Angeles. A full ADU cabinet tune-up across the kitchen and bath, all hinges and slides adjusted or replaced, runs $1,200 – $2,800 depending on cabinet count and access.

Every quote includes the part, the labor, cleanup, and our 365-Day Done Right Promise in writing. If a hinge or slide we installed fails within a year, we come back and fix it. No invoice, no argument. That’s the whole point of putting a price in writing before we touch a tool.

DIY or Call Us?

Cabinet hardware is not high-tension work, and we’re not going to scare you off a door adjustment. If you want to check whether a screw is backed out or a drawer slide is obstructed, go ahead. Most visible issues are dust, a misaligned side mount, or a screw that backed out from normal vibration.

Where DIY goes wrong is with Wellborn’s factory boring. These fronts are drilled on CNC equipment, and the cup depth is specific. A hand-drilled jig in the wrong spot leaves a door front that won’t hang flush, and now you’re replacing a $180 door instead of a $30 hinge. Same thing with face-frame cabinet pulls, if you’re replacing hardware on overlay doors. The centerline matters and it changes per door profile. We’d rather talk you through a quick check over the phone than have you drill a cabinet that’s now worse off. Call (254) 272-5876 and we’ll tell you honestly whether it’s a five-minute fix or a truck-roll call.

FAQs

A remodeled kitchen with painted cabinets and a farmhouse sink

Getting started with Sawyer

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · Free in-home estimates response · free estimates
Call (254) 272-5876
Areas We Serve

Request a Free Estimate

Tell us what you need - Sawyer Remodeling responds fast. No obligation.

By sending this request, you confirm you have read our Privacy Policy and authorize us to contact you by telephone, text message, or email about your request, including by the independent professionals who may fulfill it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch