







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Florida City
Bathroom remodeling in Florida City typically costs $9,000 to $28,000 for a full gut-and-rebuild, with smaller baths landing between $5,000 and $12,000. Most projects take 2 to 4 weeks depending on what’s hiding behind the walls. If you’re planning a remodel in one of Florida City’s older block-and-stucco homes, the single most important move is getting the plumbing rough-in scoped before any tile gets ordered. Call (254) 272-5876 and we’ll walk you through what your specific house is likely to need.
Why Sawyer Remodeling Is Florida City’s Preferred Bathroom Remodeling Company

Sawyer Remodeling has been doing bathroom remodels since 2005, and the work we do in Florida City has its own rhythm. Homes along Krome Avenue, around Davis Parkway, and through the neighborhoods off Palm Drive are mostly mid-century block construction, which means our crews show up knowing they’ll likely find cast-iron or galvanized pipe behind the walls. That’s not a surprise to us; it’s the starting point of every quote we write here.
Luca Romano runs our jobs with a simple rule: the number on the estimate is the number on the invoice. When we find hidden plumbing or a rotten subfloor mid-job, you get a written change order before any additional cost hits. Our 365-Day Done Right Promise backs every Florida City remodel in writing, and every technician who walks into your home is background-checked and in uniform. You’ll know who’s coming before they arrive.
Styles & brands we work with







Bathroom Remodeling Contractor in Florida City
A Bathroom Remodeling Contractor in Florida City does more than swap a vanity and re-tile a floor. In this city’s older block-and-stucco stock, the real work is often in the walls: replacing original cast-iron drains, re-roughing galvanized supply lines, and squaring up frame openings that have settled over decades. A full remodel here runs $9,000 to $28,000, and the spread comes down to how much of that hidden infrastructure has to be rebuilt. We scope it before we quote it, so the number you approve is the number you pay.
Scoping the hidden work
Florida City sits at the pinch point where US-1 meets the 18-Mile Stretch to the Keys, and a large share of local housing dates to the 1950s and 60s. Most bathroom remodels here start by opening a wall and finding plumbing that has to be replaced before any tile goes up. We account for that in the initial walkthrough, not as a surprise change order after demolition.
Permits and sign-off
Rough-in plumbing and electrical both require permits in Florida City, and we pull them on every job that touches those systems. The inspection sign-off happens before the wall closes, so your final trim-out isn’t stalled by a failed walkthrough. If a job is cosmetic only, we’ll tell you a permit isn’t needed and write the contract to match.
Walk In Shower in Florida City

A Walk In Shower in Florida City typically runs $4,500 to $12,000 installed, depending on the footprint and the condition of the existing drain and valve. We remodeled a hall bath in a 1950s block home near the Krome Avenue corridor, and the walk-in shower install stalled on day two when rough-in revealed galvanized supply lines that had to be swapped to PEX before the cement board could go up. We wrote a change order, updated the draw schedule, and finished the KraftMaid vanity, Silestone top, and Moen fixtures on a revised punch list. The owner said the written scope, including that change order, was what kept the job from turning into a fight.
Waterproofing that matches Florida City’s humidity
South Florida moisture moves through block walls differently than it does through wood framing, so we specify Schluter edge trim (the metal strip that waterproofs where your tile meets the floor) and full-height waterproofing behind the tile. That’s the difference between a shower that stays dry and one that grows mold behind the grout within a few seasons.
Frameless glass and layout
Frameless glass enclosures start once the pan and valve are level, and in older Florida City bathrooms with non-standard 5-foot layouts, the glass is cut to template on site. We quote the glass from a measured drawing, not an estimate, so the slab doesn’t come back short.
Trusted Brands We Service in Florida City
We finish bathrooms with materials that hold up to Florida City’s hard water and humidity, and we stock local parts for the fixtures we install. Vanities come from KraftMaid and Wellborn, tops from Cambria, Silestone, and Caesarstone, and faucets and shower valves from Kohler, Moen, and Grohe. If a cartridge fails a year in, we can usually get the replacement part locally and have it swapped without ordering from a distribution center. We also work with Cover and Dvele when a homeowner wants pre-fabricated wall panels rather than traditional tile.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Florida City Homes
- Cast-iron and galvanized pipes behind the walls. Homes built along Palm Drive and the surrounding blocks from the 1950s and 60s regularly have original supply and drain lines that are corroded or partially collapsed. Any remodel that opens a wall should budget for replacement.
- Out-of-square block walls. The same construction that keeps these houses cool makes the rough openings slightly irregular. Custom vanity sizing from KraftMaid or Wellborn solves it, but only if it’s caught during the measure, not during install.
- Rotted subfloor under old tubs and toilets. Decades of slow leaks and South Florida humidity take a toll on the plywood under bathroom floors. If we pull a tub and find the subfloor soft, that gets replaced before new tile goes down.
- Unrealistic allowance pricing. Some Florida City bids price vanities and tops at numbers that don’t match the actual sizes these bathrooms need. A non-standard 5-foot bath often requires custom cabinetry, and that cost has to be in the estimate from day one.
Pricing for Bathroom Remodeling in Florida City, FL
Here’s the honest math for Florida City. A full bathroom remodel runs $9,000 to $28,000. The range swings on two things: how much old plumbing has to be replaced and whether the layout changes. A small bathroom stays in the $5,000 to $12,000 range when the walls don’t move. Walk-in showers land between $4,500 and $12,000. Tub-to-shower conversions run $3,500 to $10,000. Shower replacement alone is $3,000 to $8,500. Vanity installs run $800 to $3,000.
What doesn’t change: every estimate includes a written price before work starts. No approved change order means no added cost. Call (254) 272-5876 for a free estimate with real numbers tied to your house, not a generic per-square-foot guess.
| Service | Florida City Price Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
We Also Serve Cities Near Florida City
Sawyer Remodeling runs crews throughout South Florida, serving Florida City plus Miami, Hialeah, Miami Gardens, and Homestead. If you’re in one of those neighboring communities and want the same written-price, change-order-free Bathroom Remodeling process, we’ll bring the same scoping discipline to your door.
Serving Florida City, FL - Our Local Coverage Area
We’re based in the Florida City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Florida City
Yes, if the job involves moving or replacing plumbing, electrical, or structural framing, Florida City requires a permit and rough-in inspections. A cosmetic update like paint, new fixtures in existing locations, or a vanity swap typically doesn’t need one. We pull permits on every job that requires them and coordinate the inspection schedule with you before the first wall opens.
Because this city’s older block-and-stucco homes hide plumbing problems that national cost calculators never see. A mid-century house on US-1 or near Krome Avenue usually has cast-iron or galvanized pipe that has to be replaced before tile work starts, plus out-of-square rough openings that drive custom vanity sizing. The $9,000 to $28,000 range reflects that reality, not inflated labor rates.
It starts with removing the old tub or shower, then opening the wall to inspect the drain, valve, and supply lines. In Florida City, that inspection often reveals galvanized pipe that gets swapped to PEX. From there, the pan is set, waterproofing goes in, tile goes up, and the frameless glass is templated and installed. Most walk-in shower installs take 3 to 5 days once the rough-in is approved.
A full remodel in Florida City typically takes 2 to 4 weeks. The schedule hinges on what the walls reveal: houses with collapsed cast-iron drains or rotted subfloors run longer because the rough-in has to be replaced and inspected before finish work begins. A tub-to-shower conversion can finish in about a week when the plumbing is in good shape. We give you a realistic calendar in writing before work starts, and if it shifts, you’ll know why.
A change order is a written amendment that spells out new work, new cost, and new schedule before that work starts. In Florida City’s older homes, change orders are common because hidden plumbing and subfloor damage can’t always be seen until demolition. Our policy is simple: no work happens beyond the written scope until you’ve approved a change order in writing. If the scope holds, the price holds.
Sawyer Remodeling serves Florida City with a written price before any work starts, a 365-Day Done Right Promise, and crews that show up when they say they will. Call (254) 272-5876 to schedule your free estimate.
Written by Luca Romano, Owner at Sawyer Remodeling, serving Florida City since 2005.










