5 Mistakes to Avoid With General Contractor
Most homeowners think the riskiest part of a remodel is the construction itself. It’s not. The real damage gets done in the 48 hours before you sign anything, when you’re relieved to have found someone and you stop asking hard questions. The five mistakes below all happen in that window. Avoid them and you’ll avoid about 90% of the horror stories people tell about contractors in Los Angeles.
Signing a contract with a start date but no written completion milestone is the single most common mistake LA homeowners make. It’s why “it’ll be done in a few weeks” turns into a four-month project with no legal recourse for delay. If you’d rather skip the research and talk to someone directly, call (254) 276-4058 for a free estimate.
Mistake 1: Paying More Than 10% (or $1,000) as a Deposit

California law caps contractor deposits at 10% of the total project cost or $1,000, whichever is less. That’s not a courtesy, that’s the law under the Contractors State License Board. If a contractor in Los Angeles asks for 30% or 50% upfront to “secure materials” or “lock in your spot,” that’s a red flag the size of a skylight.
We’ve seen homeowners hand over $15,000 on a $45,000 kitchen remodel, then spend three months calling a number that goes straight to voicemail. The law exists precisely because that scenario plays out every week somewhere in Southern California.
Here’s what a legitimate deposit structure looks like:
- Initial deposit: no more than $1,000 or 10%, per California law
- Progress payments: tied to completed, inspectable phases of work
- Final payment: held until punch-list items are done and you’ve walked the project
If a contractor pushes back on the cap, that’s not a negotiation. That’s your cue to find someone else. The contractor who respects the law on day one is far more likely to respect your house, your timeline, and your budget for the next six months.
Mistake 2: Accepting a Verbal Price or a “Ballpark” Estimate
“Probably around $40k, we’ll firm it up as we go.” If you hear anything close to that sentence, walk away. A verbal price is not a price. It’s a placeholder that only moves in one direction: up.
Every legitimate contractor in Los Angeles can produce a line-item written scope of work before you sign. That document should list every major phase: demo, rough plumbing, electrical, drywall, tile, fixtures, paint, cleanup. Each line gets a dollar amount. The total is the number you approve, and that’s the number that should appear on your invoice.
At Sawyer Remodeling, the written price is part of how we’ve operated. It’s not an upgrade, not something you have to request. The price lands in your hands before a single tool is picked up. That’s The Relay Visibility Guarantee and it’s non-negotiable on every job we run.
A real line-item scope also protects you from the “change order creep” that plagues LA remodels. When the tile you picked is suddenly backordered and the alternate costs more, a written scope means you approve that change in writing before the price changes. No surprises at the invoice.
Mistake 3: Skipping the CSLB License Verification

It takes 90 seconds. Go to the Contractors State License Board website, type in the license number, and confirm three things: the license is active, the name on the license matches the person you’re talking to, and the classification covers the work you’re hiring for. That’s it. Ninety seconds.
And yet a surprising number of homeowners in Los Angeles skip this entirely. They trust a polished website, a clean truck, or a friend’s recommendation. All of those are good signals. None of them are a substitute for the license check.
We’ve heard too many stories that start the same way: “He seemed like a nice guy.” The unlicensed operator takes the deposit and disappears, or starts demo and walks off, or does work that fails inspection and leaves the homeowner holding the cost to redo it. Insurance won’t cover unpermitted work. Your homeowner’s policy has exclusions for exactly this.
The license check also pulls up any complaints, citations, or bond claims on file. A contractor with three active disputes about abandoned projects is a contractor you don’t hire, no matter how good the price looks.
Mistake 4: No Milestone Payment Schedule Tied to Completed Work
A payment schedule that says “30% on March 1, 30% on April 1” is a calendar, not a contract. You need payments tied to completed, inspectable phases of work, not dates on a wall.
Here’s what a proper milestone schedule for a bathroom remodel in Los Angeles looks like:
- Initial deposit (capped at 10% or $1,000) – gets you on the schedule
- Demo complete – old fixtures out, space prepped, debris hauled
- Rough-in complete – plumbing and electrical inspected and passed
- Drywall and waterproofing complete – board hung, taped, and sealed
- Tile and fixtures installed – the work you can actually see
- Final payment – after punch-list, cleanup, and your final walkthrough
Each payment represents work you can verify with your own eyes or via a photo update. The Relay Visibility Guarantee includes before-and-after photo updates on every project, so you’re never paying for work you haven’t seen.
The calendar-date schedule is how homeowners end up $20,000 deep on a project that hasn’t passed rough inspection. The contractor stays afloat on your money while your house sits in pieces. Tie the money to the work and that scenario becomes impossible.
Mistake 5: Assuming the Contractor Handles Permits

This one catches more Los Angeles homeowners than any other. They sign, demo starts, the inspector shows up, and suddenly everyone’s asking who pulled the permit. The homeowner assumed the contractor did. The contractor says it was never their responsibility. The project stops dead.
Permits for bathroom remodels, kitchen remodels, and whole-home renovations in Los Angeles are not optional. Structural changes, plumbing relocations, electrical work, and sometimes even replacing a water heater require permits through the Los Angeles Department of Building and Safety.
And here’s what competitors rarely explain: the permit question has a second layer. If the contractor pulls the permit, their license is on the line and they’re accountable to the inspector. If you pull the permit as the homeowner, you’re now legally the one responsible for making sure the work meets code. That’s true even if you never swing a hammer.
Get it in writing before you sign. Ask: “Who pulls the permits, and whose name is on them?” The answer should be immediate and specific. If it’s vague, that’s a window into how the rest of the project will go.
Every Sawyer Remodeling project includes permit handling and inspection coordination as part of the written scope. We pull the permits. We schedule the inspections. Our name is on the line with LADBS, not yours.
What a Good Pre-Contract Conversation Sounds Like
So what should the 48 hours before signing actually look like? Here’s the checklist we recommend to every homeowner in Los Angeles, and it’s the same checklist we hold ourselves to:
- Written, line-item scope of work with a dollar amount on every line
- Deposit capped at $1,000 or 10%, whichever is less
- CSLB license number shown and verified active
- Milestone payment schedule tied to completed, inspectable work
- Permit responsibility in writing, with the contractor’s name on the permit
- A named completion date or milestone, not an open-ended “a few weeks”
That last one matters more than people think. A project without a written completion milestone has no teeth. California law requires a projected completion date, but “projected” gives contractors a lot of room. Your contract should spell out what happens if the deadline slips: written notice, a revised date, and a conversation about why. Silence is not an option.
If a contractor balks at any of these, you’ve learned something valuable before any money changed hands. That’s the best possible time to learn it.
When to Call a Pro
If you’re reading this after already signing something, and that something is missing a line-item scope or a permit clause, it’s not too late to get it corrected. A legitimate contractor will amend the contract. One who won’t is telling you how the next six months will go.
And if you’re in the middle of a project that’s stalled, over budget, and unpermitted, get a second opinion before throwing more money at it. A fresh set of eyes from a licensed Los Angeles general contractor can tell you what’s salvageable and what needs to be redone.
Related services in Los Angeles: we handle bathroom remodeling and whole-home renovation with the same written-price, permit-included process described above. If you’re just starting your search, our General Contractor in Los Angeles page walks through what to expect from a licensed pro, or you can get grounded with the Sawyer Remodeling home overview.
The Bottom Line
The five mistakes that sink contractor relationships all happen before the first workday. Overpaying the deposit. Accepting a verbal price. Skipping the license check. Paying on calendar dates instead of completed work. Assuming someone else handles permits. None of these are hard to avoid. They just require asking the question out loud and getting the answer in writing.
If you’re planning a remodel in Los Angeles and want a contractor who puts the price in writing, verifies the license, handles the permits, and ties payments to work you can see, call (254) 276-4058. Estimates are free and there’s no obligation. The conversation itself will tell you a lot, even if you end up going with someone else.
Frequently Asked Questions
California law caps the deposit at 10% of the total project cost or $1,000, whichever is less. Any request above that amount is a violation of Contractors State License Board regulations and a serious red flag. The cap exists to protect homeowners from the exact scenario where a contractor takes a large upfront payment and disappears.
You should make progress payments only when specific, inspectable phases of work are complete, such as demo, rough-in, drywall, and fixture installation. Avoid payment schedules tied to calendar dates, which let a contractor collect money while the project sits stalled. Each payment should represent work you can see and verify, ideally with photo documentation. Call (254) 276-4058 if you want help evaluating a payment schedule before you sign.
Whoever’s name is on the permit is legally responsible for the work meeting code. If the contractor pulls the permit, they carry that accountability. If you pull it as the homeowner, the responsibility is yours even though you’re not doing the work. Always get permit responsibility in writing before signing, and confirm the contractor’s name will be on the permit with LADBS.
Visit the CSLB website, enter the contractor’s license number, and confirm the license is active, the business name matches, and the classification covers your project type. The whole process takes about 90 seconds and also shows complaints, citations, and bond claims. Skipping this step is how homeowners end up hiring unlicensed operators who vanish after demo.