A new rear addition with a vaulted beamed ceiling and tall windows

a home addition cost - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansProudly serving local communities 21+ years
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled staircase with wood treads and a slim metal railing
A small remodeled galley kitchen with cabinets to the ceiling
A low-threshold walk-in shower with a bench and grab bar
A finished basement family room with a media wall and wet bar
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

How Much Does a Home Addition Cost?

What’s Happening

A home addition in most markets runs somewhere between $150 and $400 per square foot, depending on the complexity of the build, the materials you choose, and what your local codes require. A basic bedroom bump-out sits near the lower end; a full second-story addition or a primary suite with a bathroom pushes toward the top.

Call (254) 272-5876

That range feels wide because it is – and that’s not evasion. It reflects real variables: foundation work, roof tie-ins, electrical and plumbing extensions, permit fees, and finish level. A 400-square-foot room addition and a 400-square-foot addition with vaulted ceilings, a wet bar, and radiant heat are the same square footage on paper and completely different projects in practice. The only number that actually matters is the written estimate for your specific project, on your specific house, before a single tool comes out of the truck.

Why It Happens – What Drives the Cost Up or Down

A garage converted into a guest room and home office

Foundation and Structural Complexity

If your addition attaches to an existing load-bearing wall, the framing crew has to engineer the transfer before anything else moves. That means a beam, a header, possibly a temporary support wall while the work happens. You can usually tell this is in play if your addition butts against an exterior wall rather than cantilevering off a corner. Foundation type matters too: slab additions tie in differently than crawl space or basement homes, and that difference shows up in labor hours fast.

Roof Tie-In

Where your new roofline meets the existing roof is one of the most labor-intensive intersections in residential construction. A simple shed roof on a small addition is straightforward. A gable or hip that has to match your existing pitch, tie into existing rafters, and maintain attic ventilation takes more time and more material. If you can see a complex existing roofline from outside, expect this line item to be meaningful in your estimate.

Plumbing and Electrical Extensions

A bedroom addition that needs no new plumbing costs significantly less than a bathroom addition or a kitchen expansion. Every wet fixture you add – a sink, a toilet, a shower – means running new supply and drain lines back to your existing system. Electrical panel capacity matters too: older homes with 100-amp service may need an upgrade before a large addition can be safely wired. If your breaker box is already crowded or your home was built before the 1990s, flag that for your estimator upfront.

Finish Level and Material Selections

The framing, roofing, and rough-in costs are largely set by the project’s physical demands. The finish costs are entirely in your hands. KraftMaid or Wellborn cabinetry in a built-in wet bar, Cambria or Caesarstone countertops, Kohler or Toto fixtures in an added bathroom – these choices move the number meaningfully, and they should. Manufacturer-backed materials installed correctly hold up; mystery-brand cabinets and off-brand fixtures often don’t, and they don’t come with anyone standing behind them when something goes wrong.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

What to Do Right Now

  • Sketch your intent, not your design. You don’t need blueprints to get a useful estimate. Write down the square footage you’re thinking, the intended use (bedroom, bathroom, office, garage), and any special features. That’s enough for a first conversation.
  • Photograph the connection points. Take photos of the exterior wall where the addition will tie in, the roofline above it, the electrical panel, and any crawl space or basement access nearby. This cuts the discovery phase short and helps your estimator give you a more accurate number faster.
  • Check your local zoning setbacks before you fall in love with a footprint. Most municipalities require a minimum distance between a new structure and the property line. If you’re adding outward, a quick call to your local building department or a look at your survey can tell you how far you can actually go.
  • Stop any active water intrusion near the planned build zone. If there’s a soft spot in the floor, a water-stained wall, or a known leak near where the addition will connect, get that diagnosed first. Building over hidden moisture damage is expensive to fix later and usually not covered under any workmanship warranty.
  • Do not open walls or disturb electrical panels yourself. If you’re trying to trace an existing circuit or assess what’s behind a wall before the estimate, stop there. Panels carry live current even when breakers are off, and opening walls near plumbing or gas lines without knowing what’s behind them is a real hazard. Let the technician handle it with the right tools and training.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How We Fix It

A finished backyard cottage with a small covered porch

When your local Sawyer Remodeling team arrives, the first step is a full site read – not a guess. We walk the connection points, assess the existing structure, confirm what the local permit office will require, and look at anything your photos flagged. From that, we build a written price. Not a ballpark. A line-item written estimate that lands in your hands before any work starts, because that’s how every project under The Relay Standard works.

Once you approve it, permitting is pulled, the structural work goes first – foundation, framing, roof tie-in – then rough-in trades, then insulation, drywall, and finishes. A straightforward room addition typically runs several weeks start to finish; a larger multi-room or second-story project runs longer and we’ll tell you exactly how long in writing before we start.

This falls under our Home Renovation and General Contractor services. Every project is covered by the 365-Day Done Right Promise: if something isn’t right within a full year of project close, we come back and we make it right. No argument.

Frequently Asked Questions

Get It Fixed

A wide opening with a new beam where the kitchen wall was removed

Your local Sawyer Remodeling team is ready to walk the site, answer your questions, and put a written price in your hands – no commitment required to get the number. Call (254) 272-5876 or book online. The estimate is free, the price is in writing, and the work is backed for a full year.

Written by Luca Romano, Owner at Sawyer Remodeling, part of the Relay Home Co. family of independent local businesses, serving homeowners since 2005.

What Our Customers Say

★★★★★ 4.8 from 9+ reviews

"Good renovation. The countertop slipped a week, but I got a text and a new date right away."

- Dina M.

"Floors and paint finished on time. Floors were sanded, stained, and the walls painted without any gaps in the schedule."

- Ron T.

"Solid job. A few punch list items took a week, but they were done."

- Ike F.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A remodeled family room with new windows and a window seatA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA remodeled primary suite with built-in wardrobes and a window seatA walk-in pantry with wood shelvingA powder room with botanical wallpaper and a stone sink

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Sawyer

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · Free in-home estimates response · free estimates
Call (254) 272-5876

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Written Guarantee on Every Repair

Expires Mar 31, 2027
Free

Free Second Visit if the Repair Fails

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Los Angeles - we'll get back to you fast. No obligation.

By sending this request, you confirm you have read our Privacy Policy and authorize us to contact you by telephone, text message, or email about your request, including by the independent professionals who may fulfill it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch